Chapter 14: Software installation, upgrade, and update procedures 445

Procedure 6: Load the operating system tape on an IPE Module or an Application Module with an MVME167 card (continued)

Figure 199

Software installation summary

Selected to run mkcomply to verify correct installation.

Check the information below. If any part of the information is incorrect, the previous questions will have to be answered again.

*Format and install the new bootloader on the MVME167, controller #0, disk drive #00,

using the ddefs(1M) description Ôm147sea3283Õ.

*Create a root file system using 1 Kbyte logical blocks

on slice 0 on the MVME167, controller #0, disk drive #00.

*Create a swap area in slice 1 on the MVME167, controller #0, disk drive #00.

*Create a usr file system using 1 Kbyte logical blocks

on slice 2 on the MVME167, controller #0, disk drive #00.

*Install On-line Manual Pages Object Package (OLMP).

*Do Not Install On-line Problem Descriptions (Tars on Tape)

---> Is all of this information correct (y, n, q, ?):

28If the summary information is correct, type y and press [Return]. If it is not correct, type n, press [Return], and then enter the information correctly when prompted.

When the information is correct and you reply y to the above prompt, phases 3 and 4 of the installation begin.

Note: Phases 3 and 4 may take from 30 to 90 minutes to complete.

Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide

Page 463