Paradyne 3161 CSU manual Acculink 3161 DSU/CSU

Page 3

TM

ACCULINK 3161 DSU/CSU

Quick Reference

Document Number 3161-A2-GL11-40

February 1998

Quick Start Procedure

The following procedure is for experienced DSU/CSU users who are familiar with the 3161 DSU/CSU installation process and have no special requirements for their application. See the ACCULINK 316x Data Service Unit/Channel Service Unit Operator's Guide (3160-A2-GB21) for more information. A copy is included with the Auxiliary Backplane.

1.Install the Auxiliary Backplane onto the 3000 Series Carrier. See the ACCULINK 3151 CSU and 3161 DSU/CSU General Information Guide (3100-A2-GK40) for installation procedures.

2.Attach the DTE cable (DB15) and/or port cables (DB25) to the appropriate connectors on the Auxiliary Backplane. See the COMSPHERE 3000 Series Carrier Installation Manual (3000-A2-GA31) for detailed cable and connector information. Connect the other end of the DTE cable to the customer premises equipment.

1

Image 3
Contents Acculink 3161 DSU/CSU Copyright  1998 Paradyne Corporation All rights reserved Acculink 3161 DSU/CSU Comsphere 495-14797 Configuration Options AMI DTE Interface Configuration OptionsPort Configuration Options 1 ESFPort Configuration Options 2 Network Interface Configuration Options Port Configuration Options 3RBS DTE Drop/Insert Port Channel Configuration OptionsChannel to assign D1, D2, ... D24 Function key under the channelData Port Channel Configuration Options 1 NET384 336 Data Port Channel Configuration Options 2 Meaning Comments/Description UnassignedIf assigned to NET General Configuration Options 1544If external Ascii User Configuration Options 1COM port User Configuration Options 2Enabled Specifies whether a password isUser Configuration Options 3 Alarm Configuration Options 1Rate General Management Configuration Options 1 Alarm Configuration Options 2PPP General Management Configuration Options 2Management Trap Configuration Options