Taylor taylor manual Priming

Page 28

24

Models 150, 152, 162, 168

Operating Procedures

Priming

Prime the machine as close as possible to the time of

first product draw.

Step 1

With a pail beneath the door spout, raise the draw

valve. Fill the mix hopper with

fresh

mix. (Maximum

hopper capacity is 8 quarts [7.6 liters].) Allow the mix

to flow into the freezing cylinder. This will force out any

remaining sanitizing solution. When full strength mix is

flowing from the door spout, lower the draw valve.

Note: Use only FRESH mix when priming the

freezer.

Figure 36

Step 2

When the mix has stopped bubbling down into the

freezing cylinder, install the feed tube in the mix inlet

hole. Make sure the small hole in the feed tube is down.

Figure 37

Step 3

Momentarily raise the draw switch paddle to activate

the refrigeration cycle. Place the power switch in the

“AUTO” position. When the unit cycles off, the product

will be ready to serve.

Figure 38

Step 4

Place the mix hopper cover in position.

Repeat Steps 1 through 4

for the second freezing

cylinder on Models 162/168.

Step 5

Install the front drip tray and splash shield under the

freezer door.

Figure 39

Image 28