Manuals
/
Brands
/
Power Tools
/
Lathe
/
Southbend
/
Power Tools
/
Lathe
Southbend
SB1049F owner manual
Please, tick the box below to download manual:
Contents
Main
Manual Insert
MODEL SB10 49F HEAVY-13 13" X 30" GEARH EAD LATHE w/DRO
New & Changed Parts
SB1049F
Model SB1049F
Heavy 13 - 13" x 30" Gearhead Lathe with Fagor DRO
Product Dimensions
Shipping Dimensions
Electrical
Mfd. Since 12 /13 Model SB1049F
Other
Features
Mfd. Since 12 /13 Model SB1049F MANUAL INSERT
Page
C
u
F
l
f
Table of Contents
Page
About This Machine
Foreword
Capabilities
Features
General Identication
Master Power Switch
Controls & Components
Headstock
Control Panel
Carriage
Tailstock
Safety Foot Brake
End Gears
-8-
13" Heavy 13 Gearhead Lathe INTRODUCTION
Product Specications
www.southbendlathe.com
Product Dimensions
Shipping Dimensions
Electrical
-9-
Main Motor
Coolant Motor
Operation Information
-10-
13" Heavy 13 Gearhead Lathe INTRODUCTION
Headstock Information
Tailstock Information
Threading Information
-11-
Construction
Other
Understanding Risks of Machinery
Basic Machine Safety
Page
Additional Metal Lathe Safety
Additional Chuck Safety
Preparation Overview Things You'll Need
The typical preparation process is as follows:
Power Supply Requirements
Availability
Full-Load Current Rating
Circuit Requirements
Extension CordsGrounding Requirements
Unpacking
Inventory
Main Inventory 1: (Figure 10) Qty
Tool Box Inventory: (Figure 11) Qty
Pre-Installed (Not Shown) Qty
Cleaning & Protecting
Space Allocation
Weight Load
Physical Environment
Electrical Installation
LocationLocation
Lifting & Moving
Leveling & Mounting
Leveling
Assembly
Lubricating Lathe
Bolting to Concrete Floors
Adding Coolant
Power Connection
Test Run
Page
Page
Page
Spindle Break-In
To perform the spindle break-in:
Recommended Adjustments
Operation Overview
Chuck & Faceplate Mounting
Installation & Removal Devices
Chuck Installation
To install the chuck:
Chuck Removal
Registration Marks
To remove the chuck:
Scroll Chuck Clamping
4-Jaw Chuck
Mounting Workpiece
Faceplate
To mount a non-concentric workpiece to the faceplate:
Positioning Tailstock
Using Quill
Tailstock
Installing Tooling
To install tooling in the tailstock:
Removing Tooling
Offsetting Tailstock
To offset the tailstock:
Aligning Tailstock to Spindle Centerline
Centers
Dead Centers
Live Centers
Mounting Dead Center in Spindle
Mounting Center in Tailstock
Removing Center from Spindle
To mount a center in the tailstock:
Removing Center from Tailstock
Mounting Workpiece Between Centers
Steady Rest
!
Follow Rest
Carriage & Slide Locks
Installing Tool
Tool Needed Qty
To install a tool in the tool post:
Four-Way Tool Post
Tool Needed Qty
Compound Rest
Aligning Cutting Tool with Spindle Centerline
To align the cutting tool with the tailstock center:
Micrometer Stop
Adjustable Feed Stop
Manual Feed
Carriage Handwheel
Cross Slide Handwheel
Compound Rest Handwheel
Spindle Speed
Setting Spindle Speed
Conguration Examples
Setting Spindle Speed of 200 RPM
Setting Spindle Speed of 2000 RPM
Power Feed
Power Feed Controls
Setting Power Feed Rate
Setting Power Feed Rate of 0.18mm/rev
mm in.
Standard End Gear Conguration
End Gears
.18 LCS8W .007
Alternate Conguration
Conguring End Gears
To congure the end gears:
Headstock Threading Controls
Setting Metric Thread Pitch of 1.75
Threading
mm
C
Apron Threading Controls
Thread Dial
Thread Dial Chart
Chip Drawer
Coolant System
To use the coolant system on your lathe:
Accessories
Page
Page
Maintenance Schedule
!
Cleaning & Protecting
-65-
Annual Service
South Bend Lathe Co.
Lubrication
Headstock
Checking Oil Level
Adding Oil
Changing Oil
Quick-Change Gearbox
Checking Oil Level
Adding Oil
Draining Oil
Apron
One-Shot Oiler
Longitudinal Leadscrew
Ball Oilers & Oil Cup
End Gears
Coolant System Service
Hazards
To change the coolant:
Adding Fluid
Changing Coolant
Items Needed: Qty
Machine Storage
Cross Slide
Backlash Adjustment
Compound Rest
Gib Adjustment
Leadscrew End Play Adjustment
Page
Half Nut Adjustment
Tool Needed: Qty
V-Belts
To adjust the V-belts:
Brake & Switch
Page
Leadscrew Shear Pin Replacement
To replace the shear pin:
Page
Gap Removal
Gap Insert Removal & Installation
Gap Installation
-84-
-85-
-86-
13" Heavy 13 Gearhead Lathe TROUBLESHOOTING
Electrical Safety Instructions
Shock Hazard:
WIRING DIAGRAM COLOR KEY
NOTICE:
Wire Connections:
Wiring Overview
-89-
Component Location Index
-90-
Electrical Cabinet Wiring
To Power Supply Connection, Page 94
Ground
0 220
024
Page
-92-
Spindle Motor
V1
Ground
V
Ground
Control Panel Wiring
Figure 139. Control panel location.
NO
NC
Tend TM-1308
Additional Component Wiring
Power Connection
220VAC L6-30 Plug (as recommended)
Master Power Switch
Headstock Cover
-96-
Headstock Controls
-97-
Headstock Controls Parts List
-98-
Headstock Internal Gears
-99-
Headstock Internal Gears Parts List
-100-
Headstock Transfer Gears
-101-
Gearbox Gears
-102-
Gearbox Gears Parts List
-103-
Gearbox Controls
-104-
Gearbox Controls Parts List
-105-
Apron Front View
-106-
Apron Front View Parts List
-107-
Apron Rear View
-108-
Apron Rear View Parts List
-109-
Compound Rest & Tool Post
-110-
Saddle Top View
-111-
Saddle Top View Parts List
-112-
Saddle Bottom View
-113-
Micrometer Stop
Dial Indicator
-114-
Bed & Shafts
-115-
Bed & Shafts Parts List
REF PART # DESCRIPTION REF PART # DESCRIPTION
-116-
End Gears
-117-
Main Motor
-118-
Main Motor Parts List
-119-
Stands & Panels
-120 -
Cabinets & Panels Parts List
-121-
Tailstock
-122-
Tailstock Parts List
-123-
Steady Rest Follow Rest
-124-
Electrical Cabinet & Control Panel
-125-
Accessories
Front Machine Labels
-127-
Rear & Side Machine Labels
Page
WARRANTY
Warranty