
Total Access 1248 Octal T1 IMA DSLAM Installation and Maintenance Practice
5-108 61179641L4-5B
The E1 Performance Monitoring Status screen hot keys are defined in Table 5-74.
CV-P Code Violations This code indicates an occurrence of either a CRC-6
error or frame bit error on the path.
CV-L Code Violations This code indicates an occurrence of either a CRC-6
error or frame bit error on the line.
ES-L Errored Seconds This code indicates seconds with either a bipolar
violation or a CRC-6 error on the line.
Table 5-74. E1 Performance Monitoring Status Screen Hot Keys
Hot Key Description Function
BBackward(2hrs/15min PM) This hot key is used to display performance monitoring
statistics for the last 2 hours, in 15 minute intervals.
CClear PM Stats This hot key is used to clear the performance monitoring
statistics.
FForward(2hrs/15min PM) This hot key is used to display performance monitoring
statistics for the next 2 hours, in 15 minute intervals.
NNext Port This hot key is used to display the next port.
PPrevious Port This hot key is used to display the previous port.
SSelect Port This hot key is used to select a specific port.
Table 5-73. E1 Performance Monitoring Status Screen Codes (Continued)
Code Definition Description