Maintenance

Daily Preventive Maintenance Checklist

Machine ____________________________

Week Of: ________________

 

 

 

 

 

 

 

 

 

Operator ___________________________

 

 

 

Days

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Checks

1

2

3

 

4

 

5

6

7

 

 

 

 

 

 

 

 

 

 

 

 

Observe All Safety Warnings!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Beginning of Day

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Inspect water inlet valve hose connections on the back of

 

 

 

 

 

 

 

 

 

 

the machine for leaks.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Inspect steam hose connections for leaks, where

 

 

 

 

 

 

 

 

 

 

applicable.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.

Verify that insulation is intact on all external wires and

 

 

 

 

 

 

 

 

 

 

that all connections are secure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.

Inspect door lock and interlock before starting operation:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a. Attempt to start the washer with door open.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b. Close the door without locking it and attempt to start

 

 

 

 

 

 

 

 

 

 

the washer.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

c. Close and lock the door, start a cycle, and attempt to

 

 

 

 

 

 

 

 

 

 

open the door while the cycle is in progress.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

End of Day

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.

Clean the AC drive box filter(s).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Clean motor cooling fan filter.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.

Clean the door gasket of all foreign matter.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.

Clean automatic supply dispenser and lid.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.

Clean the washer’s top, front, and side panels.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6.

Leave loading door open at the end of each day to allow

 

 

 

 

 

 

 

 

 

 

moisture to evaporate.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Unload the machine promptly after each completed cycle to prevent moisture buildup.

 

 

 

 

 

 

 

Note: Leave loading door open after each completed cycle to allow moisture to evaporate.

 

 

 

 

 

 

 

Note: Improper replacement of the AC drive box filter will result in clogging of the pump.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50

F232058