STEAM PIPING INSTALLATION
INSTALLATION
INSTRUCTIONS
PIPING RECOMMENDATIONS
1.Set and anchor dryer in position. Machine should be level to assure proper steam circulation.
2.To prevent condensate draining from headers to dryer, piping should have a minimum 12” (305 mm) above respective header. Do not make steam connection to header with a horizontal or downwardly facing tee or elbow.
3.Whenever possible, horizontal runs of steam lines must drain, by gravity, to respective steam header. Water pockets, or an improperly drained steam header will provide wet steam, causing improper operation of dryer. If pockets or improper drainage cannot be eliminated, install a bypass trap to drain condensate from the low point in the steam supply header to the return.
4.In both steam supply and steam return line, it is recommended that each have a 3/4” (20 mm) union and 3/4” (20 mm) globe valve. This will enable you to disconnect the steam connections and service the dryer while your plant is in operation.
5.Before connecting trap and check valve to dryer, open globe valve in steam supply line and allow steam to flow through dryer to flush out any dirt and scale from dryer. This will assure proper operation of trap when connected.
6.After flushing system, install bucket trap (with
7.Install union and globe valve in return line and make final pipe connections to return header.
1.Trap each dryer individually. Always keep the trap clean and in good working condition.
2.When dryer is on the end of a line of equipment, extend header at least 4 feet (2 m) beyond dryer. Install globe valve, union, check valve and bypass trap at end of line. If gravity returned to boiler, omit trap.
3.Insulate steam supply and return line for safety of operator and safety while servicing dryer.
4.Keep dryer in good working condition. Repair or replace any worn or defective parts.