Page 5

ELECTRICAL REQUIREMENTS

CAUTION - The brewer must be disconnected from the power source until specified in

Initial Set-Up.

Requires 2-wire,
grounded service
rated 120 volts ac,
15 amp, single
phase, 60 Hz.
1425W VERSION 3180W VERSION
Requires 3-wire,
grounded service
rated 120/240 volts
ac, 20 amp, single
phase, 60 Hz.
ELECTRICAL HOOK-UP
CAUTION Improper electrical installation will damage electronic components. The toggle switch is set to operate
on a 120 volt, 15 amp service (1425W Version).
1. An electrician must provide electrical service.
2. Determine the available on-site electrical service.
3. Select the desired unit wattage based on the available on-site electrical service.
4. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
5. If the brewer is to be connected to 120/208 or 120/240 volts, remove the front access panel beneath the
sprayhead and remove the power cord (if provided) from the terminal block.
6. Feed the supply leads through the rear of the brewer.
7. Using the above diagrams, connect the desired electrical service to the field wiring terminal block.
8. If re-wiring the machine for operation on 120/208 or 120/240 volts with a Power Supply Cord, the replacement
Power Supply Cord must be UL Listed Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, No. 12 AWG, 4
Conductor, Rated 90° C. Attachment Plug Cap must be UL Listed, NEMA 14-20P or L14-20P Configuration,
Rated 125/250V, 20 AMPS. The Power Supply Cord must be at least 3 feet long and maximum 6 feet long
(measured from Strain Relief to end of the Attachment Plug Cap).
9. Before proceeding, verify the voltage at the field wiring terminal block.
10. Set toggle switch on component bracket to the appropriate position (120/208-240V) and replace the access
panel.
11. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for

Initial Set-Up

.
29707 080503
Models CDBC-DV, CDBC-APS DV & CDBCF LPTC-DV
Brewers with an attached cord set require 2-wire, grounded service rated 120 volts ac, 15 amp, single
phase, 60 Hz. Requirements for brewers without an attached cord set are as follows: