
Installation Step 3
Attach the Rail to the Header Bracket
| • | Position the opener on the garage floor below the | |
|
| header bracket. Use packing material as a protective | |
|
| base. | |
| If the door spring is in the way you’ll need help. Have | ||
| someone hold the opener securely on a temporary | ||
Header Wall | support to allow the rail to clear the spring. | ||
• | Position the rail bracket against the header bracket. | ||
| |||
Header Bracket | • | Align the bracket holes and join with a clevis pin as | |
Rail Bracket |
| shown. | |
| • | Insert a ring fastener to secure. | |
Ring Fastener
Header Bracket
Rail
Clevis Pin
Rail
Bracket
Rail
Garage
Door
Foam Packaging
Opener Carton or
Temporary
Support
Hardware Shown Actual Size
Clevis Pin |
|
5/16" x | Ring Fastener |
15