PRE-INSTALLATION PREPARATION

Framing

7

PRE-INSTALLATION

PREPARATION

Continued

FRAMING

1.Frame appliance enclosure as illustrated in Figures 7 and 8.

Note: If a wall covering is used to line the enclosure, then all measurements must be from the surface of the covering.

2.Place the appliance into the framing and secure it.

Note: If appliance is to be raised above floor level, a platform must be built to support the appliance.

3.Install the supply line to the appliance using a 1/2" NPT black iron gas line terminating 2 5/16" above the bottom of the appli- ance. The gas line may be installed from either side or from the rear of the appliance (see Figure 19, page 11).

4.Feed flexible gas line through one of three gas line conduit sleeve and repack insulation to cover any openings. Prepare the incoming gas line with teflon tape or pipe joint compound and hook-up incoming gas line to the flexible gas line.

Note: If 1/2" NPT black iron pipe does not mate with fitting at the end of flexible gas line, remove fitting and replace with a 37 degree flare 3/4"-12, 1/2" NPT (female) fitting.

WARNING: When finishing appliance, do not overlap combustible material ontothe black front face. Brick,tile, or other noncombustible materials may be applied to the face provided that any gap is between the material used and the face is caulked with a noncombustible caulking.

These Dimensions Allow for a 3/4" Clearance at Sides and Back of Fireplace. However, 0" Clearance is Permitted

12"

393/8"

16 3/4"

 

16"

55 5/8"

3/4" Clearance

Not Required

34 1/2"

at Nailing

 

Flanges

Figure 8 - Corner Installation Guidelines

36 5/8"

16 1/8"

34 3/4"

Figure 7 - Rough Opening for Installing in Wall

For more information, visit www.desatech.com

108660

Page 7
Image 7
Desa VP324, VP325(B) installation manual Framing, Corner Installation Guidelines