
Mitel
•As Link number select 1, and as Cabinet number, Shlf number, and Slot number select the numbers in which the T1 Q.SIG line is being installed.
•Set Digital Link Descriptor Number to the link descriptor assignment number defined in Step 5 of the
•The Text field can be left blank or a description of the link can be entered.
•Press [ESC] then [4] to commit to changes and [ESC] then [1] to confirm the changes.
•Press [ESC] then [Q] to return to the Digital Link Forms menu.
•Press [ESC] then [7] to return to the Customer Data Entry interface.
28