STEP 14
CHECKLIST FOR OPEN BURNER INSTALLATION
MAKE SURE ALL CONTROLS ARE IN THE “OFF” POSITION.
Gas supply is “on”
Electric power is “on”
Burner drip pans in position under burners
Surface burners in position
Burner pans in positions
Burner grates in position
Oven and broiler racks installed
Surface burner ignition test
Griddle/Grill burner ignition test
Griddle/Grill assembly in position
Gas oven ignition test
MAKE SURE ALL CONTROLS ARE LEFT IN THE “OFF” POSITION
Date Installed & Inspected _________________________________________________
Authorized Installer’s Signature _____________________________________________
Please Print Name ________________________________________________________
NOTE: Please leave this checklist, Use & Care manual and product registration
card with the Homeowner.