AIR FOR COMBUSTION AND VENTILATION

 

12"

 

Ventilation Grills

Ventilation

Into Adjoining Room,

Option 2

Grills into

Or

Adjoining

Remove

Room,

Door into

Option 1

Adjoining

 

Room,

 

Option 3

Continued

ing and one within 12" (30.5 cm) of the floor. Connect these items directly to the outdoors or spaces open to the outdoors. These spaces include attics and crawl spaces. Follow the National Fuel Gas Code, ANSI Z223.1/NFPA 54, Air for Combustion and Ventilation for required size of ventilation grills or ducts.

IMPORTANT: Do not provide openings for inlet or outlet air into attic if attic has a thermostat- controlled power vent. Heated air entering the attic will activate the power vent.

12"

Figure 2 - Ventilation Air from Inside

Building

Ventilation Air From Outdoors

Provide extra fresh air by using ventilation grills or ducts. You must provide two permanent openings: one within 12" (30.5 cm) of the ceil-

 

Outlet

Ventilated

 

Attic

 

Air

 

 

Outlet

 

 

Air

 

To Attic

 

 

 

 

To

 

 

Crawl

Inlet

 

Space

 

 

Air

 

 

 

Inlet Air

Ventilated

 

Crawl Space

 

 

Figure 3 - Ventilation Air from Outdoors

Installation

NOTICE: This heater is intended for use as supplemental heat. Use this heater along with your primary heating system. Do not install this heater as your primary heat source. If you have a central heating system, you may run system’s circulating blower while using heater. This will help circulatetheheatthroughoutthe house. In the event of a power outage, you can use this heater as your primary heat source.

WARNING: A qualified service person must install heater. Follow all local codes.

WARNING: This appliance is equipped for either natural gas or propane/LP gas but not both. Gas typeisindicatedontheratingplate. Field conversion is not permitted.

CHECK GAS TYPE

Use only the correct gas type (natural or propane/LP) for your unit. If your gas supply is not correct, do not install heater. Call dealer where you bought heater for proper type heater.

INSTALLATION ITEMS

Before installing heater, make sure you have the items listed below.

for propane/LP gas, external regulator (supplied by installer)

piping (check local codes)

sealant (resistant to propane/LP gas)

equipment shutoff valve *

ground joint union

sediment trap

tee joint

pipe wrench

for natural gas, test gauge connection*

hardware packet (included)

-wall anchor (4) 095112-02

-red key (1) 095116-01

-pan head screw, black (4) 097403-02

-nylon spacer (2) 099064-02

-clip (1) 099123-01

-Phillips head screw, silver (4) 100159-02

* An equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge con- nection. The optional equipment shutoff valve can be purchased from your dealer.

125311-01A

www.fmiproducts.com

7