
97
CHAPTER 2 DEPENDENCE FUNCTIONS
2.2.7.1 Setting SequencerThe sequencer operates in the following order:
(1) The sequencer starts from level 1 simultaneously with the start of program executing.
(2) Depending on the setting at each level, branching to the required level is performed
when the condition is met.
(3) When sequencer termination is specified, the sequencer terminates when the
condition is met.
(4) When the sequencer terminates, the delay counter starts counting.
■Setting Sequencer
Figure 2.2-6 shows the sequencer operation.
Figure 2.2-6 Operation of Sequencer
Start executing program. (Start sequencer.)
SetConditions Operation whenCondition Met
[Use event number 1-] [Pass counter]
[Use event number 2-] [Pass counter]
[Use event number 3-] [Pass counter]
[Use event number 4-] [Pass counter]
[Use event number 5-] [Pass counter]
[Use event number 6-] [Pass counter]
[Use event number 7-] [Pass counter]
[Use event number 8-] [Pass counter]
Timer condition [Waiting time]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
[Trace control]
/
[Branch level number]
Terminat
sequence
r
Branch to specified level.
Start delay