Loading Documents on the ADF

NOTICE

Be sure to change the position of the shipping lock according to the “Installation and Connection” procedure before operation.

ADF

 

ADF paper chute

 

 

 

Guide

Guide lever

ADF lever

Stacker

1

Lift up the ADF paper chute and lock the

bar in its operating position.

Operating position

Bar

3-4