Haier 3150 SB Installation, General Information, Leak Detection System, Grounding, Stand, 310622L

Models: 1590 SB 3150 SA 3150 SF 1590 SA 3150 SB

1 40
Download 40 pages 55.19 Kb
Page 5
Image 5
Installation

Installation

General Information

The typical installation shown in FIG. 3 is only a guide for selecting and installing system compo- nents. Contact your Graco distributor for assistance in planning a system to suit your needs.

Always use genuine Graco parts and accessories.

Reference numbers and letters in parentheses refer to the callouts in the figures and the parts lists on pages 26 - 31.

Installation

Moving Parts Hazard

Keep clear of moving parts.

General Information Bolts (V) may be loosened to allow the pump, while still securely mounted to the bracket, to be rotated for draining or servicing.

The pump is very heavy (see Technical Data on pages 34 and 37 for specific weights). If the pump must be moved, follow the Pressure Relief Proce- dure on page 10 and have two people lift the pump by grasping the outlet manifold securely, or use appropriate lifting equipment. Never have one person move or lift the pump.

Leak Detection System

Moving Parts Hazard A leak detection system will be included with all

Leak Detection System approved pumps. See manual 311200 included with leak detector for leak detector instal- lation instructions.

Tighten Clamps Before First Use

After you unpack the pump, and before you use it for the first time, check all clamps, and tighten as necessary.

659

V

TI8765a

FIG. 1

Grounding

To reduce the risk of static sparking, ground the pump and all other equipment used or located in the pumping area. Check your local electrical code for detailed grounding instructions for your area and type of equip- ment.

Stand

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

See pages 30 and 31 for parts.

 

 

 

 

 

 

 

 

 

Pump: Connect a ground wire and clamp as shown

1.

Place the stand assembly on a level surface.

in FIG. 2. Loosen the grounding screw (W). Insert

 

 

2.

Mount the pump securely to the brackets using bolts

one end of a 12 ga (1.5 mm²) minimum ground wire

(X) behind the grounding screw and tighten the

 

(659).

 

screw securely. Connect the clamp end of the

 

 

3.

Tighten the bolts (V) to hold the slotted bracket in

ground wire to a true earth ground. To order a

 

 

 

 

 

 

 

 

place. See FIG. 1.

ground wire and clamp, order part number 222011.

 

Tighten Clamps Before First Use Bolts (V) must be tightened to hold the bracket in place during operation.

310622L

5

Page 5
Image 5
Haier 3150 SB Installation, General Information, Leak Detection System, Tighten Clamps Before First Use, Grounding, Stand