HP 16510B, 16500A Installing New Logic Analyzer Boards into the Mainframe, Power Requirements

Models: 16510B 16500A

1 272
Download 272 pages 19.77 Kb
Page 245
Image 245

A

Installing New Logic Analyzer Boards into the Mainframe

Introduction

Initial

Inspection

Power Requirements

This appendix explains, how to initially inspect the HP 16510B State/Timing Module, how to prepare it for use, storage and shipment. Also included are procedures for module installation.

Inspect the shipping container for damage. If the shipping container or cushioning material is damaged, it should be kept until the contents of the shipment have been checked for completeness and the module has been checked mechanically and electrically. The contents of the shipment should be as listed in the "Accessories Supplied" paragraph in Chapter 1.

If the contents of the container are incomplete, there is mechanical damage or defect, or the instrument does not pass the performance tests, notify the nearest Hewlett-Packard office. Procedures for checking electrical performance are in Section III of the HP 16510B Service Manual.

If the shipping container is damaged, or the cushioning material shows signs of stress, notify the carrier as well as the Hewlett-Packard office. Keep the shipping material for the carrier’s inspection. The Hewlett-Packard office will arrange for repair or replacement at Hewlett-Packard’s option without waiting for claim settlement.

All power supplies required for operating the HP 16510B State/Timing Module are supplied to the module through the backplane connector of the HP 16500A Logic Analysis System mainframe.

HP 16510B

Installing New Logic Analyzer Boards into the Mainframe

Front-Panel Reference

A-1

Page 245
Image 245
HP 16510B Installing New Logic Analyzer Boards into the Mainframe, Introduction Initial Inspection, Power Requirements