A
Installing New Logic Analyzer Boards into the Mainframe
Introduction
Initial
Inspection
Power Requirements
This appendix explains, how to initially inspect the HP 16510B State/Timing Module, how to prepare it for use, storage and shipment. Also included are procedures for module installation.
Inspect the shipping container for damage. If the shipping container or cushioning material is damaged, it should be kept until the contents of the shipment have been checked for completeness and the module has been checked mechanically and electrically. The contents of the shipment should be as listed in the "Accessories Supplied" paragraph in Chapter 1.
If the contents of the container are incomplete, there is mechanical damage or defect, or the instrument does not pass the performance tests, notify the nearest
If the shipping container is damaged, or the cushioning material shows signs of stress, notify the carrier as well as the
All power supplies required for operating the HP 16510B State/Timing Module are supplied to the module through the backplane connector of the HP 16500A Logic Analysis System mainframe.
HP 16510B | Installing New Logic Analyzer Boards into the Mainframe |