4. Fill hole with concrete. Tamp down concrete to release air pockets and build drainage hill.

5. Insert J-bolts (1) from mounting plate (3) into cement as shown. Move assembly around to release any air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to level mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off any excess cement on mounting plate at this time.

NOTE: Check leveling of mounting plate (3) several times while concrete is curing.

IMPORTANT!

Front of mounting plate (3) must be parallel with playing surface.

WARNING

DO NOT PROCEED TO STEP 6 UNTIL

CONCRETE HAS CURED FOR A

MINIMUM OF 72 HOURS. ALLOW

ADDITIONAL TIME FOR COLD, WET

OR HUMID WEATHER.

PLAYING SURFACE

3

P/N 211560H 01/03

4

Page 4
Image 4
Huffy AC4052, AC4064, AC4054, AC4062 manual 211560H 01/03