6.Remove the nut (6mm) securing the green ground wire on the left hand side of the Power Module.

7.Disconnect the hose from the bottom tank.

8.The Hot Water Tank Module can be removed from the brewer.

9.Install the new module and connect all of the appropriate connections, hoses, and wires making sure that they are secure and tight.

10.Conduct a BIT test (see appendix VII on page 85) to insure the proper function of the brewer.

B3000 SERVICE MANUAL

 

60-200807-000, REV C

48