NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

HEARTH PRODUCTS

KITS AND ACCESSORIES

750,253M
REV. NC 06/2008

INSTALLATION INSTRUCTIONS FOR FACADE KITS

FOR USE wITh ADAGIO™ DIRECT-VENT GAS FIREpLACES

TM
FPO

KIT CONTENTS:

1 ea. Facade Assembly
1 ea. Left Gate
1 ea. Right Gate

TOOLS / SUppLIES NEEDED:

None

GENERAL INFORMATION

These decorative facade kits are offered in two attractive styles, Iron Garden
Gate and Copper Garden Gate. If you encounter any problems or need
clarification of these instructions, contact you local distributor or dealer.
Note: The framing of the appliance will need to be elevated by 3/4"
minimum above the floor to allow for the proper fit of the facade (i.e. 3/4"
board as platform). See Installation Instructions Manual.
INSTALL ONLY whEN FIREpLACE IS OFF AND COOL.
ALL wARNINGS, pRECAUTIONS AND INSTRUCTIONS pROVIDED IN ThE
INSTALLATION INSTRUCTIONS MANUAL AND ThE CARE AND OpERATION
MANUAL pROVIDED wITh ThE AppLIANCE AppLY TO ThESE INSTRUC-
TIONS. ThOROUGhLY READ AND FOLLOw ThE INSTRUCTIONS pRO-
VIDED wITh ThE AppLIANCE BEFORE pROCEEDING TO ThE FOLLOwING
INSTRUCTIONS.

Cat. No Model Description

h5775 ADAGIO-IG Garden Gate, Vintage Iron Facade
h5776 ADAGIO-CpD Garden Gate, Vintage Copper Facade
1
Figure 1 - Kit Contents
Iron Garden Gate Facade
Copper Garden Gate Facade
Installer: Leave This Instruction Sheet With The Appliance.
Consumer: Retain This Instruction Sheet For Future Reference.

INSTALLATION INSTRUCTIONS

1. Install the appliance, firebox liner and logs per the Installation Instruc-
tions Manual provided with appliance and the Installation Instruction
Sheet provided with the firebox liner kit (sold separately).
hanging Brackets
Back of Facade Shown