S TAC K ING K IT INS TAL L ATION

1.

2.

1)P osition the unit on a level surface,

2) R emove the 2 plastic covers (shown in figure 6) attached

capable of supporting the entire

to the middle of the stacking kit, and save these for

weight of the dryer.

later use. R emove the double back tape and firmly attach

R emember that the unit will be

the stacking kit the top of the washer to assure the

heavier when it is fully loaded.

proper seal.

( back )

3.

3)P ut back edge of stacking kit to back mold line of washer’s top cover and tighten the screw.

4.

4)Install all 7 screws provided with a power drill

and tighten the stacking kit to the unit base securely.

6.

C lean the surface where the stacking

Make sure the word FR ONT printed on the stacking kit

kit is going to be installed.

is facing forward as shown above.

 

P lace the mounting bracket on the

 

 

Washer as indicated.

 

 

5.

 

 

5) Y our Dryer is equipped with 4 leveling legs .

 

6.

Make sure they are lowered 10 mm, so there is a

gap between the legs and the dryer base.

 

6) G ently push the dryer into position as indicated in figure 5 & 6, sliding the unit into theslots provided.

It is importantthatthe dryer is level.

Make sure all four leveling legs are pushed all the way back into the slots to ensure proper mounting.

 

7) Insert the plastic covers

 

(removed in section 2)

 

covering the two front

 

slots of the leveling legs .

7.

Depending upon the

location of the unit, it may

be necessary to change

 

the side on which the dryer

 

door opens .

8.

DC 68-01052A

Page 1
Image 1
Maytag DC68-01052A, MAL2424AXX manual Back, TAC K ING K IT INS TAL L Ation