
viii
ix
CONTENTS
Introduction  1
Assembling Blocks for Transport  1
Truck Pack  1
M3D Transport  3
Before Hanging an M3D Array  3
Choosing Rigging Point Capacities  3
M3D Placement Calculator  4
Measuring a Venue  5
General Hanging Considerations  6
Do’s and Don’ts  6
Lifting Mechanisms  7
Use Front and Back Motors Whenever Possible  7
Choosing Pickup Points  8
Array Assembly and Angle Adjustment  9
Starting Array Assembly  9
Stacking an M3D Array  10
Attaching Motors to the MTG-3D Top Grid  10
Attaching M3Ds to the MTG-3D Top Grid  11
Adjusting Angles  12
MTG-3D Top Grid to First M3D Angle Adjustment  12
Adjusting Top M3D Top Grid Downtilt  12
Adjusting MTG-3D Top Grid Uptilt  13
Adjusting Splay Angle in an Array  14
Removing Caster Rails  15
Adding a Block of M3Ds to an Array  16
Flying a Completed Array  18
Including M3D-Subs in an Array  19
Striking the Array  19
Appendix A — Congurations and Load Ratings  20
General  20
About These Load Ratings  20
Measured Angles  20
Angle Between Bridle and Grid  20
Maximum Top Grid Angle  20
Bridle Leg Lengths  20
Conguration A  21
Conguration B  23
Conguration C  25
Conguration D  27
Conguration E  29
Conguration F  30
Conguration G  31