Installation Manual

3.7.2Checks After Start-up

After initial start-up of the system, normal operation should be tested. At the minimum, the following tests should be performed (refer to the EPS 7000 Users Manual for procedures), as applicable to your installation:

Emergency power off (EPO) test.

Remote emergency power off (REPO) test (if applicable).

Inverter start and stop.

Battery transfer test.

Maintenance bypass procedure.

3.8Shutdown

Shutdown procedures in this section apply to the EPS 7000 cabinet under normal, emergency, overload, and mainte- nance conditions.

Installation

page 3 — 7