CHAPTER 3 ND-71548 (E)
Page 94
Issue 2
INSTALLATION PROCEDURE
STEP 8: Attach the Front Panel again by fastening the removed two screws at the lower
side of the front panel.
STEP 9: Connect SW PWR CA-A cable again.
STEP 10: Connect 50AL FLT CA-A to KEYA and KEYB connectors on PZ-DK237.
Figure 009-10 Cable Connections to the ISAGT card
STEP 11: Attach the top cover again by using the removed ten screws.
Figure 009-11 Attaching the Top Cover
NAP-200-009
Sheet 10/13
Setting of Switch Positions and
Mounting of Circuit Cards
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
CPR
Front Panel
PZ-DK237
KEYB
KEYA
PWRSW
SLOT No.
PWR SW
0
LOAD CPUOPE
PMOPE
WDT
123456
SW PWR CA-A 50AL FLT CA-A
Tie-Wrap
Note:Secureallcablesatthetie-wrapsothattheymaynotblockflowofair.
Note
STEP 8
STEP 9
STEP 10
Front Panel
SLOT No.
PWR SW
0
LOAD CPUOPEPMOPEWDT
123456
Top Cove
r
CPR