CHAPTER 3 ND-71548 (E)
Page 64
Issue 2
INSTALLATION PROCEDURE
STEP 5: Fix a FAN fuse (5.0A) onto the PZ-M369 by referring to Figure 005-4.
STEP 6: Connect the remaining FAN cables as per Figure 005-10 and Figure 005-11.
STEP 7: Lastly, attach the Top Cover onto the TOPU of the cabinet. Then, fasten the four screws (refer to Fig-
ure 005-7).
Note: The procedures, STEP 1 through STEP 7, must be performed at each PBX cabinet adopting 3-PIM or 4-
PIM configurations.
NAP-200-005
Sheet 11/18
Mounting of Units and Modules