Nortel Networks 1000M warranty Installing the CP PIV to I/O panel cables

Models: 1000M

1 458
Download 458 pages 7.95 Kb
Page 220
Image 220

Page 220 of 456 Cabling Common Equipment in a Multi Group system

Figure 91

CP PIV Core and Network backplanes

 

 

 

 

 

 

NT4N89 cable

 

 

 

 

 

 

 

 

Network backplane

 

 

Core backplane

 

 

 

 

 

 

 

A B

System Monitor

 

 

 

 

 

 

(XSM) connections

 

 

 

 

 

 

 

J3

Group 7

Group 6

Group 5

Group 4

Group 3

Group 2

Group 1

J2 J1

 

 

 

 

 

 

 

j3

j3

j3

j3

j3

j3

j3

 

slot 12

slot 12

slot 11

slot 11

slot 10

slot 10

slot 9

 

port 1

port 0

port 1

port 0

port 1

port 0

port 1

 

j4

j4

j4

j4

j4

j4

j4

 

slot 12

slot 12

slot 11

slot 11

slot 10

slot 10

slot 9

 

port 1

port 0

port 1

port 0

port 1

port 0

port 1

 

NT4N29 cable

 

 

 

 

 

 

 

j3 slot 9 port 0

 

j4 slot 9 port 0

 

 

 

 

Group 0

 

NT4N29 cable

 

 

 

 

 

 

 

 

 

 

 

 

 

E

D

 

 

 

 

 

 

 

553-9473

Installing the CP PIV to I/O panel cables

Connect the cables from the CP PIV card faceplate to the I/O panel on the back of the Core/Net modules:

COM1 is used to connect a terminal.

COM2 is used to connect a modem.

LAN 1 is used to connect the system to a LAN switch.

LAN 2 is used to connect Core 0 to Core 1 for system redundancy.

Note: If there is no LAN, LAN 1 and LAN 2 are connected from Core 0 to Core 1.This connection is made on the backplane.

NN43021-310 Standard 02.01 December 2007

Page 220
Image 220
Nortel Networks 1000M warranty Installing the CP PIV to I/O panel cables, CP PIV Core and Network backplanes