11.2.5.CONNECT THE CABLE TO THE INDOOR UNIT

1.The inside and outside connecting cable can be connected without removing the front grille.

2.Connecting cable between indoor unit and outdoor unit shall be approved polychloroprene sheathed 4 × 1.5 mm2 flexible cord, type designation 245 IEC 57 (H05RN-F) or heavier cord.

••Ensure the color of wires of outdoor unit and the terminal Nos. are the same to the indoor’s respectively.

••Earth lead wire shall be longer than the other lead wires as shown in the figure for the electrical safety in case of the slipping out of the cord from the anchorage.

••Secure the cable onto the control board with the holder (clamper).

INSTALLATION OF SUPER ALLERU-BUSTER FILTER

1.Open the front panel.

2.Remove the air filters.

3.Put Super Alleru-buster filter into place as shown in illustration below.

CS-TE9DKE CU-TE9DKE / CS-TE12DKE CU-TE12DKE

HOW TO TAKE OUT FRONT GRILLE

Please follow the steps below to take out front grille if necessary such as when servicing.

1.Set the vertical airflow direction louver to the horizontal position.

2.Slide down the two caps on the front grille as shown in the illustration below, and then remove the two mounting screws.

3.Pull the lower section of the front grille towards you to remove the front grille.

Caution

When reinstalling the front grille, first set the vertical airflow direction louver to the horizontal position and then carry out above steps 2 - 3 in the reverse order.

AUTO SWITCH OPERATION

The below operations will be performed by pressing the “AUTO” switch.

1.AUTO OPERATION MODE

The Auto operation will be activated immediately once the Auto Switch is pressed.

2.TEST RUN OPERATION (FOR PUMP DOWN/SERVICING PURPOSE)

The Test Run operation will be activated if the Auto Switch is pressed continuously for more than 5 sec. to below 8 sec. A “pep” sound will occur at the fifth sec., in order to identify the starting of Test Run operation.

45