4. Hold a Bolt Spacer (80) inside the lower end of

4

 

 

 

the Right Upright (78). Insert a 3/8" x 4 1/2" Bolt

 

6

 

 

 

 

(6) with a 3/8" Star Washer (9) into the Right

 

78

 

 

Upright and the Bolt Spacer. Repeat this step

 

 

 

 

 

 

 

with a second Bolt Spacer (80), 3/8" x 4 1/2"

 

 

 

9

Bolt (6), and 3/8" Star Washer (9).

 

 

 

 

 

 

 

Hold the Right Upright Spacer (79) and the

 

 

 

38

 

 

 

80

Right Upright (78) against the Base (83). Be

 

 

 

 

 

 

 

careful not to pinch the Upright Wire (38).

 

 

 

 

Tighten the 3/8" x 4 1/2" Bolts (6) with your fin-

 

 

 

80

gers; do not fully tighten the Bolts yet.

 

 

 

77

 

 

 

 

79

Press a Base Endcap (77) into the Base (83).

 

 

 

 

 

 

83

 

 

5. With the help of a second person, carefully tip

5

B

 

 

the treadmill onto its right side. Partially fold the

 

 

 

 

 

Frame (56) so that the treadmill is more stable;

 

A

 

 

do not fully fold the Frame yet.

 

 

 

 

Remove and discard the two indicated bolts (A)

 

 

 

 

and the shipping bracket (B).

 

 

 

 

 

 

81

 

56

Attach a Base Pad (81) to the Base (83) in the

 

 

 

 

 

 

 

location shown with a 1" Tek Screw (2) and a

 

2

 

32

Base Pad Spacer (13). Then, attach another

 

 

 

 

 

Base Pad (81) with only a 1" Tek Screw (2).

 

 

 

 

Remove the 3/8" Nut (8), the 3/8" x 2" Shoulder

 

13

 

 

 

83

 

 

Bolt (32), and the shipping bracket (C) from the

 

 

 

84

Base (83). Attach a Wheel (84) with the Bolt and

 

 

 

 

2

81

C

the Nut that you just removed. Do not over-

 

 

 

 

tighten the Nut; the Wheel must turn freely.

 

 

 

8

Discard the shipping bracket.

 

 

 

 

6. With the help of a second person, hold a Bolt

6

 

 

 

Spacer (80) inside the lower end of the Left

 

 

 

 

 

 

 

Upright (74). Insert a 3/8" x 4 1/2" Bolt (6) with a

 

6

 

74

3/8" Star Washer (9) into the Left Upright and

 

 

 

 

 

 

the Bolt Spacer. Repeat this step with a sec-

 

9

 

 

ond Bolt Spacer (80), 3/8" x 4 1/2" Bolt (6),

 

 

 

 

 

 

 

and 3/8" Star Washer (9).

 

76

 

 

 

 

 

 

Orient the Left Upright (74) and the Left Upright

 

80

 

 

Spacer (76) as shown. Hold the Left Upright

 

 

 

 

 

 

 

Spacer and the Left Upright against the Base

 

 

 

 

(83). Tighten the two 3/8" x 4 1/2" Bolts (6) with

 

80

 

 

your fingers; do not fully tighten the Bolts yet.

 

77

 

 

 

 

83

 

 

Press a Base Endcap (77) into the Base (83).

 

 

 

 

With the help of a second person, tip the tread-

 

 

 

 

mill so that the Base (83) is flat on the floor.

 

 

 

 

 

8

 

 

 

Page 8
Image 8
ProForm PFTL12007.0 user manual Careful not to pinch the Upright Wire, Gers do not fully tighten the Bolts yet