C2-010 / C2-010-I ADSL2+ Router User’s Guide

2. Installation Planning
Before installing the ADSL2+ Router, you should gather information and equipment needed to install the
device, then Install the hardware as instructed, connect the cables to the device and power on the ADSL2+
Router. Prior to accessing the web-based software built into the ADSL2+ Router, you should check the IP
settings on your computer and change them if necessary.
2-1

2.1

2.2

Packing List

Please check the package contents by comparing them with the following list:
One ADSL2+ Router
One telephone lines
One straight-through Ethernet Cable
One Power Adapter

Interfaces Introduction

2.2.1 Front Panel

Figure
2–1 Front Panel
Power Steady green light indicates the unit is powered on. When the device is powered off this
remains dark.
Status Lights steady green during power on self-test (POST). Once the connection status has been
settled, the light will blink green. If the indicator lights steady green after the POST, the system
has failed and the device should be rebooted.
ADSL:
Link/Act Steady green light indicates a valid ADSL connection. This will light after the ADSL negotiation
process has been settled. A blinking green light indicates activity on the WAN (ADSL) interface.
LAN:
Link/Act A solid green light indicates a valid link on startup. This light blinks when there is activity
currently passing through the Ethernet port.