TC12 Installation, Commissioning & Maintenance Handbook
2.3.1.8 RCD Tests
T tion master Switch
C n to the ma
S itch the Instation master Swi
P g the RCD Tester into a main the Instation. Set the trip
c rent on the tester to 30 mA. P on the RCD
tester display that the RCD has in 200 ms. Reset the RCD.
S the tester ck
on the RCD tester display that the RCD has tripped within 40 ms.
D connect the tester from the c
2.3.1.9 Safety of Mains Supply at C
The customer is to ensure th supply that the Instation is to be
plugged into meets the requirements of IEE Wiring Regulations (BS7671).
.3.2 Commissioning Procedure after Power Up
C e transmit LEDs (g EDs (yellow) on the modem
P
urn the Insta OFF.
onnect the Instatio ins.
w tch ON.
lu s socket at the front of
ur ress the button on the tester. Check
tripped with
et the trip current on to 150 mA. Press the button on the tester. Che
is ontroller and reset the RCD.
ustomer Site
at the mains
2
Switch on and check all power LEDs on the PSU and Modem PCBs are lit.
heck that th reen) and receive L
CBs illuminate correctly - see section 2.4.1.
666/HE/43100/000 Page 46 Issue 9