SpectraLink Corporation Installation and Operation
Link WTS – Link 150 M3 MCU
2.1 Installation Steps and Responsibilities
9 Task
Description
Wire
Contractor or
Electrician
Field
Service
Engineer
Customer
Project Mgr/
System Admin
Site Preparation
Determine location of MCU 9
Run Cable for System
Run cable to Base Station locations 9
Pull cable 9
Terminate cable at Base Station locations 9
Prepare and install demarc blocks 9
Assign and program ports 9
Connect cables to demarc blocks 9
Install SpectraLink System
Survey site and check components 9
Install MCUs 9
Install Base Stations 9
Install outdoor Base Stations 9
Connect and register handsets 9
Set up diagnostic modem 9
Register handsets 9
Program handset features 9
Test handsets 9
Site certification 9