SECTION II. OPERATING PROCEDURES
4-4. OPERATING PROCEDURES
This section deals with normal procedures, and includes all steps
necessary to ensure safe and efficient operation of the TI4100GPU-24
(Turbo Start 4100). As experience is gained with the Turbo Start
4100, the user will be able to maximize the unit’s unique capabili-
ties to enhance the flexibility of aircraft maintenance and support
operations. NOTE
When the TURBO START 4100 is not in use, it should

always

remain
plugged into a suitable AC power source to insure operational readi-
ness at all times. REMEMBER, when the AC line cord is plugged in, the
unit must be placed in the horizontal position to allow the cooling
fan to operate properly!
4-5. BEFORE OPERATION CHECK
1. CHECK UNIT FOR STATE OF CHARGE- Ensure power unit is connected to
a suitable AC power source (208-240 Single Phase VAC 30AMP max out-
let). The LED status indicator should show a single green bar ( last
LED bar ) to indicate the unit’s power cells are fully charged.
NOTE:
A full charge is indicated by Either a steady lighted green bar or a
blinking green bar at the bottom of the bar graph column The fan will
also exhibit ratcheting but will not come on when the unit is fully
charged.
2. CHECK UNIT FOR EVIDENCE OF DAMAGE - Check for dents, punctures,
case distortion or misalignment, cracked or loose connectors, and
that cooling fan is functioning.
4-2
STATUS