4
.
20 Power Board and Switch Board 4 Replacement Procedures
Satellite/Satellite Pro/L650 Maintenance Manual 4-51
Installing the Power Board and Switch Board
Install the Power Board and Switch Board according to the following procedures and Figure
4-30.
1. Seat the power board in the correct position and secure it with the two M2x2 black
flat head screws.
2. Seat the switch board in the correct position and secure it with the two M2x3 black
flat head screws.
3. Connect the switch cable to CN9020 on the button board.