
Assembly Instructions
PTO Shaft Guard Installation
Position the shaft guard as shown and mount with two
Attach Guard
PTO Shaft Guard Installation
NOTE: A
(P/N 9772) is required for decks installed on the
Mount the two (2)
Roller Wheels
Mower Deck Installation on Tractor
Deck Installation
1.Lightly grease each deck support arm (2) on the tractor. Refer to Mower Deck Installation photo for location of deck support arm.
2.Engage the deck carrier frame tube sockets on the tractor support arms. Slide the deck onto the support arms.
NOTE: When installing the DSD52 Mower deck, make sure to retract the dolly wheel after mounting the deck on the tractor.
3.Install the hitch pin through the hole on the end of each support arm to lock the deck in place (refer to Counterweight Spring Receptacle Assembly photos). Two (2) hitch pins are included in the owner’s packet of materials.
4.Connect the mower deck PTO drive shaft assembly to the tractor with the splined quick disconnect coupler. This coupler simplifies shaft alignment and installation.
a.Use the arrows on the shaft and tube to align and slide the PTO quick coupler onto the deck splined shaft.
b.Reaching under the tractor, pull the ring back on the coupler, slide onto the spline shaft on the tractor, and release the ring.
IMPORTANT: To prevent damage to the mower, make sure the PTO shaft assembly is securely locked on the tractor, with the locking balls fully seated in the groove and the ring in the full forward position (refer to the Coupler Ring “Locked” Position photo). After installation, pull on the shaft to check for security.
16