LINK 20 INTRODUCTION
Congratulations! You have purchased the world's only Dual Watchtm battery monitor. In order to understand, use, and install it, PLEASE read this manual. It provides important information. Please contact us with suggested improvements. For Link 20 installation, operation, warranty support, and repair questions, please contact Xantrex.
The Link 20 provides instrumentation of two banks of batteries. The Link 20 does not controlaninverter/charger.ForinstallationsinvolvingaFreedomInverter/Chargerandtwo battery banks, Xantrex recommends the Link 2000. If a Freedom Inverter/Charger and one battery is anticipated, Xantrex recommends the Link 1000. For instrumentation of a single battery bank with no inverter/charger controls, the Link 10 is ideal.
This symbol is used to point out very important sections of this manual or to indicate items that may need to be changed through Set Up routines. Please take the time to read these sections.
The following warnings must be considered during the installation of the Link 20. Failure to read and follow these special notes can lead to damage to the Link 20 or other electricalequipment.
POWER CONNECTION WARNINGS
1.When installing your Link 20, make all shunt and ground connections BEFORE applying power to the unit.
2.The wires connecting the battery to the dual shunt, and from the dual shunt to your system ground, will carry large current. Size the wire appropriately. Large batterry banks contain enough energy to start a fire if improperly sized wire is used.
3.Disconnect all charging sources during the installation process.
IMPORTANT BATTERY FACTS
1.An amp hour (Ah) is 1 amp of current flowing for one hour, or 2 amps for 1/2 hour, or 4 amps for 1/4 hour, and so on.
2.Many batteries designed for
3.Our