WIRING CONNECTIONS TO
THE Link 20
Make the necessary wire connections to the Link 20 as shown in the following diagram:
CAUTION
Use
NOTE: The screw terminals are small. During assembly and testing, the screw terminals are tightened. To accommodate wires, loosen the screws until flush with the top of the terminal strip and pry open the wire clamp with a paper clip. The holes will accept 16 AWG wire IF you have a clean cut, clean strip and twist the wires tightly. Use needle- nosed pliers to insert the wires.
NOTE: BE SURE TO
USETWISTEDWIREFOR
GREEN&ORANGE
ANDYELLOW&BROWN
SHUNTSENSEPAIRS.
4 twisted pair cable
REAR VIEW OF
LINK 20
| |||
1 |
|
| |
| |||
2 |
| ||
|
| ||
1 | 3 |
| |
2 |
| ||
3 | 4 |
| |
| |||
| 5 |
| |
4 | |||
5 | 6 | ||
|
| ||
|
| 7 | |
| 6 | ||
| 8 |
7
8
Meter Location
[1]DC - Meter Negative (BLACK)
[2]Bat. 1 Shunt Sense Load Side (GREEN)
[3]Bat. 1 Shunt Sense Battery Side (ORANGE)
[4]Bat. 1 Voltage Sense
[5]DC + Meter Power
[7]Bat. 2 Voltage Sense
34[6] Bat. 2 Shunt Sense Battery Side (YELLOW)
[8]Bat. 2 Shunt Sense Load Side (BROWN)