WIRING CONNECTIONS TO

THE Link 20

Make the necessary wire connections to the Link 20 as shown in the following diagram:

CAUTION

Use correct-sized screwdriver for terminal screws. Tighten firmly but do not over-tighten to avoid damage.

NOTE: The screw terminals are small. During assembly and testing, the screw terminals are tightened. To accommodate wires, loosen the screws until flush with the top of the terminal strip and pry open the wire clamp with a paper clip. The holes will accept 16 AWG wire IF you have a clean cut, clean strip and twist the wires tightly. Use needle- nosed pliers to insert the wires.

NOTE: BE SURE TO

USETWISTEDWIREFOR

GREEN&ORANGE

ANDYELLOW&BROWN

SHUNTSENSEPAIRS.

4 twisted pair cable

REAR VIEW OF

LINK 20

-BLACK

 

1

 

 

-GREEN

 

2

-ORANGE

 

 

 

1

3

 

2

-BLUE

 

3

4

 

-RED

 

 

5

 

4

-VIOLET

5

6

-YELLOW

 

 

 

 

7

 

6

-BROWN

 

8

7

8

Meter Location

[1]DC - Meter Negative (BLACK)

[2]Bat. 1 Shunt Sense Load Side (GREEN)

[3]Bat. 1 Shunt Sense Battery Side (ORANGE)

[4]Bat. 1 Voltage Sense (0.1–50 V DC) (BLUE)

[5]DC + Meter Power (9–40 V DC) (RED)

[7]Bat. 2 Voltage Sense (0.1–50 V DC) (VIOLET)

34[6] Bat. 2 Shunt Sense Battery Side (YELLOW)

[8]Bat. 2 Shunt Sense Load Side (BROWN)