Top cable entry

Top view of top cover

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top view of input and output

UPS Summary

NormalNormal

~

~

 

L1 IN

L1 OUT

L2 IN

L2 OUT

L3 IN

L3 OUT

L1 IN

L2 IN

L3 IN

 

L1 OUT

L2 OUT

L3 OUT

Side view of PE busbar.

1. Loosen the 8 bolts to remove top cover.

Note: No drilling or cutting should take place over the top of the UPS.

2.Drill holes for grommets.

3.Re-fit the covers and install the grommets.

4.Feed the cables through the grommets. Connect cables at cable connection points.

5.Connect Protective Earth conductor to busbar locations.

Symmetra MW II 1200 kW 3 x 400/230 V Installation - 990-1979E-001

11

Page 15
Image 15
APC MW II manual Top cable entry