INSTALLATION

Continued

Installing Blower Accessory

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and danger- ous operation.

CAUTION: Verify proper op- eration after servicing.

Note: If you are using a mantel with your fireplace, use the following instructions. If your fireplace is built-in, see For Built-In Installation, page 15.

1.Install snap bushings found in blower kit into hole in left side of outer casing and into one of the holes in rear of remote/blower bracket.

2.Make sure the wire harness is firmly connected to the terminals on the blower bracket assembly.

3.Note the wire locations on back of AUTO/ OFF/ON switch. The terminals on back of switch are numbered 1, 2, and 3. Carefully remove red wire from terminal 3 and blue wire from terminal 1. Black wire can remain on middle terminal 2 (see Figure 15).

4.Carefully disconnect green and white wires at their insulated connectors (see Figure 16).

5.In top of the fireplace cabinet, locate the four mounting holes on the outer casing. Align these four holes with those on the blower bracket assembly. Attach blower bracket as- sembly to the outer casing with 4 #10 screws provided (see Figure 15).

6.Route the wire harness through the hole in left side of baffle and between firebox wrapper and outer casing.

7.Insert the 4 wire harnesses from behind the remote/blower bracket through hole in rear of bracket with bushing and through the left rectan- gular hole to front of fireplace (see Figure 15).

8.Reconnect red wire to switch position 3. Reconnect blue wire to switch position 1. Reconnect green and white wires.

9.Install the switch plate on the remote/blower bracket with 2 #10 screws provided (see Figure 17). Route power cord out of the cabinet by inserting it through the bushing on the outer casing (see Figure 15). Plug fan kit into 120- Volt grounded power supply and test operation. Note: When switch is in the AUTO position, the fan will start after the fireplace has run for a few moments. The fan will continue to run for several moments after the fireplace has been turned off. When switch is in the ON position, the fan will run until turned to OFF.

10.Reinstall upper louver beginning with bottom screws (see Figure 12, page 12). Close lower louver door.

Blower

Wiring Routing

Wire Hole in Baffle

 

Bracket

Blower

Assembly

Harness

Mounting

Screw

 

Holes

 

 

Switch

Power

 

 

Cord

3

 

2

 

1

 

Switch

Plate

Wire

Remote/

 

Blower

 

Harness

 

Bracket

 

 

Lower Louver

 

 

 

 

Door

Figure 15 - Installing Blower Bracket Assembly (Remote-Ready Unit Shown)

Fan Switch(Auto/Off/On)

1Auto

Off

2

 

 

3

Blue

Thermostat

 

 

 

On

 

Switch

 

 

(N.O.)

 

 

 

Blue

110/115

Red

 

Blower

V.A.C.

 

 

 

 

Motor

Black

 

 

 

 

Red

 

 

 

White

 

 

White

Green

 

 

Green

Figure 16 - Wiring Diagram For Blower Accessory Standard Installation

Remote/

Blower

Bracket

Switch

Plate

Screw Figure 17 - Installing Switch Plate to Remote/Blower Bracket

14

www.desatech.com

111244-01D

Page 14
Image 14
Desa CDCFNR installation manual Installing Blower Accessory, Cord

CDCFNR specifications

Desa CDCFNR, or the Community Development and Capacity Building Framework for Natural Resources, is a pioneering initiative designed to empower local communities in managing their natural resources sustainably. This comprehensive framework is particularly focused on fostering resilience and enhancing the socio-economic conditions of communities that depend on these resources.

One of the main features of Desa CDCFNR is its emphasis on community participation. The framework encourages active engagement of community members in decision-making processes, which ensures that the management of natural resources reflects the needs and aspirations of local populations. By involving communities, the framework promotes a sense of ownership, responsibility, and accountability towards natural resource management.

Technologically, Desa CDCFNR leverages various innovative tools and platforms to facilitate data collection, sharing, and analysis. Geographic Information Systems (GIS) are utilized to map natural resources and analyze spatial patterns, which aids in effective planning and resource allocation. Mobile applications are also employed to engage community members, allowing them to report changes in resource availability or environmental conditions in real time. This use of technology ensures that data-driven decisions can be made promptly, leading to more adaptive management strategies.

Another notable characteristic of Desa CDCFNR is its integrated approach. It does not view natural resource management in isolation; instead, it recognizes the interplay between social, economic, and environmental factors. This holistic perspective ensures that interventions are designed to address multiple dimensions of sustainability, including economic development, environmental conservation, and social equity.

Capacity building is at the heart of the Desa CDCFNR initiative. Training programs and workshops are organized to enhance the skills of community members in areas such as sustainable farming practices, water management techniques, and biodiversity conservation. By building local capacities, the framework aims to equip communities with the necessary tools and knowledge to manage their resources effectively and adapt to changing environmental conditions.

In summary, Desa CDCFNR focuses on community engagement, harnesses technology for better resource management, adopts an integrated approach to sustainability, and emphasizes capacity building. Together, these features position Desa CDCFNR as a transformative framework in the realm of community-led natural resource management, paving the way for sustainable development and resilience in local communities.