SNMP-NV6

5.3.2.4 Outlet Control

Press the Switch Bank button to control the UPS output relay to turn on or off individual output banks.

5.3.2.5 Power Fail/Restore Simulation

Pressing one of the buttons causes the card to simulate the UPS power fail or power restore event. Based on this function, we can test all of the connected software to verify whether they work properly or not. The UPS will remain in its original state and will not go to the battery mode.

5.3.3 Weekly Schedule

This menu allows you to modify the parameters of the shutdown/restart/test events associated with the days of the week.