
Contents
Preface xix
1.Getting Started
1.1 System Requirements
1.1.1.1 Hub Connectivity
1.1.2 | Electrical and Environmental |
1.2Unpacking
1.3Handling Switches
1.4Connectors
1.5Jumper Options
1.6 Switch and RTM Faceplates |
| |
1.6.1 | Base 10/100/1000 Uplink Ports | |
1.6.2 | 10/100 Management Port | |
1.6.3 | Serial Management Port |
1.7RTM Airflows
1.7.1 | RTM Airflow Requirements | |
1.7.2 | RTM Pressure Drop Versus Airflows (Impedence Curves) | |
1.8 Removing and Installing Switches | ||
1.8.1 | Removing a Switch Set |
v