2.5Switching ON the Power Switch and the Power-On Sequence

Switching ON the power of the Autoloader executes an automatic power-on sequence.

1.Connect the AC power cable.

2.Press the right side ( ) of the Autoloader front panel power switch to switch the power ON.

3.When the power is supplied, the POWER LED lights in green and the power-on test starts.

4.When the power-on test ends normally, "READY" and "DRV empty" are alternately displayed on the top level of the LCD.

Power switch

Figure 2-6 Powering on the LTO2 Autoloader

2.6 SCSI ID Setting

Please check that the SCSI ID of the Autoloader is not already being used by a server/workstation or another SCSI device. (Prior to shipping from the factory, the SCSI ID of the Autoloader was set as described below.)

See "3.6 Setting the SCSI ID" for information about how to check the SCSI IDs that have been set and for the method of changing them when required.

Important

The Autoloader and the tape drive must each have an independent SCSI ID. This device has a specification that does not allow duplication of the tape drive and Autoloader IDs. Please check that the IDs of other SCSI devices on the same SCSI bus do not duplicate the IDs of the tape drive and the Autoloader.

SCSI ID at time of factory shipping

Tape drive

:

(1)

Autoloader

:

(0)

- 12 -

Page 28
Image 28
Tandberg Data Tandberg LTO2 manual Switching on the Power Switch and the Power-On Sequence, Scsi ID Setting