250 Z & Javelin Series
 Quick Setup List -
Page  | Setup Procedure  | Steps to Perform  | 
6  | Uncrating  | ❏ Remove crate & banding.  | 
  | 
  | ❏ Place transmissions in ROLL RELEASE position & roll off  | 
  | 
  | skid.  | 
  | 
  | 
  | 
7  | Battery Activation &  | ❏ Charge the battery (Note: proceed with other setup steps  | 
  | Installation  | while battery is charging).  | 
  | 
  | ❏ Install & secure battery.  | 
  | 
  | 
  | 
8  | Check Fluid Levels | ❏ Fill & check Engine oil level.  | 
  | 
  | ❏ Reduce & check tire pressures  | 
  | 
  | (Front tires 25 psi, rear tires 15 psi).  | 
  | 
  | 
  | 
9  | Mower Assembly  | ❏ Torque mower blade hardware.  | 
  | 
  | 
  | 
9  | Lubrication  | ❏ Lubricate all grease & oil points.  | 
  | 
  | 
  | 
10  | SAFETY CHECKS | ❏ Check for LOOSE HARDWARE.  | 
  | 
  | ❏ Check all OPERATOR CONTROLS.  | 
  | 
  | ❏ Perform MOWER BLADE STOPPING CHECK.  | 
  | 
  | (Blade must stop within 5 seconds!)  | 
  | 
  | ❏ Perform SAFETY INTERLOCK SYSTEM CHECK.  | 
  | 
  | 
  | 
10  | Burnish Electric Clutch | ❏ Burnish electric clutch (run for 15 seconds, repeat 10 times).  | 
  | 
  | ❏ Repeat MOWER BLADE STOPPING CHECK.  | 
(Blade must stop within 5 seconds!)
1/2006  | 5  | TP   |