3.1INSTALLATION
A.Must comply with:
1.Local, state, provincial, and national codes, laws, regulations and ordinances
2.National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition
3.National Electrical Code, ANSI/NFPA 70 – latest edition
4.Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME
5.Canada only: CAN/CSA B149 Installation Code and CSA C22.1 CEC Part I
6.Manufacturer’s installation instructions, including required service clearances and venting guidelines
B.Manufacturer’s representative to verify proper and complete installation.
3.2START-UP
A.Shall be performed by Raypak
B.Test during operation and adjust if necessary:
1.Safeties (2.2 - F)
2.Operating Controls (2.3)
3.Static and full load gas supply pressure
4.Gas manifold and blower air pressure
C.Submit copy of
3.3TRAINING
A.Provide
B.Schedule training at least seven days in advance.
END OF SECTION