ASSEMBLY / PRE-OPERATION
INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD (See Fig. 7)
NOTE: The
1.Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower.
2.Position chute rotater head over chute bracket. If nec- essary, rotate chute assembly to align square and pin on underside of chute rotater head with holes in chute bracket.
3.With chute rotater head and chute bracket aligned, position chute rotater head on pin and threaded stud of mounting bracket.
4.Install 3/8 washer and locknut on threaded stud and tighten securely.
CHUTE |
|
ROTATER |
|
HEAD | 3/8 LOCKNUT |
| 3/8 WASHER |
CHUTE
BRACKET
PIN
THREADED
STUD
ROTATER HEAD
MOUNTING
BRACKET
FIG. 7
CHECK TIRE PRESSURE
The tires on your snow thrower were overinfl ated at the fac- tory for shipping purposes. Correct and equal tire pressure is important for best snow throwing performance.
•Reduce tire pressure to
7