Sears 486.248392 owner manual Attaching Snow Thrower to Tractor, Installing the Auger Belt

Page 15

ATTACHING SNOW THROWER TO TRACTOR

NOTE: An additional person's help may be required to mount the snow thrower to the front of the tractor.

Place the tractor and snow thrower on a flat, level surface so that the tractor can be rolled forward to attach the snow blower.

Remove the Attachment Pin from the snow thrower.

Extend the belt out behind the snow thrower, making sure the belt is still looped over the top of the large drive pulley and underneath the two idler pulleys. The "V" side of the belt must be seated in the grooves of all three pulleys.

Roll the tractor up behind the snow thrower, center- ing it between the snow thrower's mounting plates.

Raise the rear of the snow thrower by lifting up on the lift handle until the notches in the mounting plates align with the shoulder bolts in the tractor's side plates. Guide the bolts into the notches.

To ease the assembly of the auger drive belt, delay the installation of the attachment pin shown in figure 29 until you have assembled the belt as instructed for figures 30 and 31.

 

ATTACHMENT PIN

1/8" HAIRPIN

COTTER

 

SHOULDER

 

BOLT

 

 

MOUNTING PLATE

SIDE

 

PLATE

 

FIGURE 29

RIGHT SIDE VIEW

INSTALLING THE AUGER BELT

The auger belt comes preassembled to the pulleys on the snow thrower housing. Make sure the belt passes over the top of the auger pulley and then twists 1/4 turn to pass underneath each side idler pulley. The "V" side of the belt must mate with the grooves of the pulleys. See figure 30.

TWIST

AUGER PULLEY

TWIST

1/4 TURN

1/4 TURN

IDLER

IDLER

PULLEY

PULLEY

FIGURE 30

Push the lift handle down to increase slack in the belt (attachment pin must first be removed).

Remove the 1/8" hairpin cotter that secures the end of the idler arm spring to the right side of the clutch idler assembly. Swing the idler arm to the left side. See figure 31.

Place the auger belt around the rear pulley and between the two pulleys on the idler arm. The "V" side of the belt must be seated in the grooves of the "V" pulleys. See figure 31.

Hold this drawing above you while viewing the Clutch/Idler Assembly from underneath the tractor. Right and left in the drawing will be the reverse of the viewer's right and left.

1/8" HAIRPIN

COTTER

￿

(Removed from￿

end of spring)

IDLER

ARM

 

REAR

LEFT SIDE

PULLEY

OF

 

TRACTOR

FIGURE 31

VIEWED FROM UNDERNEATH

15

Image 15
Contents 42- 2 Stage Snow Thrower Tractor Attachment Table of Contents WarrantyAccessories and Attachments Safety Hardware Package Contents Carton Contents AssemblyTractor Preparation Tools Required for AssemblyInstalling Side Plates on Tractor Removal of Parts from CartonFront Tractors with Axle Mounted Front Suspension BracketsThese Holes Must be EmptyLock NUT Installing Hanger BracketsInstalling Shoulder Bolts Left Side ViewBolt and NUT Installing CLUTCH/IDLER AssemblyManual ROD Operated Attachment Clutch Remove ExtensionManual Cable Operated Attachment Clutch Viewed from UnderneathNEW Engine Pulley Keeper with Original BOLT, NUT and Washer View of Bottom Electric Attachment ClutchesAssembly of the Snow Thrower EnginePulley Greased Surface Attaching Snow Thrower to Tractor Installing the Auger BeltAttaching Weight Tray to Tractor Installing the Attachment PINSetting the Auger Belt Tension Checklist Alternate Instructions if Tire Chains RUB Against HEX BoltRear Reflectors Know Your Snow Thrower HOW to Start Your Snow ThrowerHOW to Stop Your Snow Thrower HOW to USE Your Snow Thrower OperationRemoving Snow MaintenanceOperating Tips Raising and LoweringService and Adjustments Storage Recommendations TroubleshootingRemoving the Spiral Auger Housing StorageParts Part QTY Description Repair Parts for Model 486.248392 42 Snow Thrower Repair Parts for Model 486.248392 42 Snow Thrower Page Neuvers While on a Slope Slope GuideSU-HOGAR SM Get it fixed, at your home or ours