Buhler FK311 warranty #500 and #600 Snowblower Assembly Instructions, Hand Crank Assembly Standard

Page 6

500 & 600 Snowblower

#500 AND #600 SNOWBLOWER ASSEMBLY INSTRUCTIONS

1.Mount the discharge spout (#2) using the spout clamp (#3) bolted to the spout ring on the snowblower. Lubricate the spout ring and clamp. NOTE: A hydraulic cylinder and hose kit to control the spout deflector is available as an option.

2.Hitch Assembly: With right and left hitch tubes (#5 & #6) turned as shown in drawing, slide them into the sleeve welded to the main body. These tubes are adjustable to four different positions. The correct position for each individual tractor will be determined when mounting the snowblower on the tractor. These tubes are connected to the snowblower with a ¾” x 3 ¼” pin (#11) and a hair pin clip (#12). Bolt the left (#84) and the right (#85) hitch arms to the outside of the clevises on the hitch tubes using the lift pins (#9). NOTE: Pins should be turned to the outside. Do not tighten any hardware until assembly is complete. Join the top of the hitch arms by bolting a 1” O.D. x 2 ¼” spacer (#4) between the top plates using a ¾” x 4” bolt and lock nut through the lower outside holes. Bolt the hitch top bar (#86) between the same plates using the same bolt through the welded tube on the bar. Use the inside holes on the top plates for the top bar. The other end of the hitch top bar bolts to the top of the blower fan housing with a ½” x 1 ¾” hex bolt, lock washer and hex nut. Use the same hole position as the hitch tubes. Tighten all hardware.

A category 1 top link pin (#8) is fitted in the top holes of the hitch arm plates. This pin is used for standard three-point hitch only. The bushing in the lower holes is used for the Quick Hitch.

3.Hand Crank Assembly: (Standard)

a)Bolt the crank mounting bracket (#16) to the top of the hitch using 3/8" x 1 ¼” hex bolts, lock washers and hex nuts.

b)Insert the crank tube (#15) through the mount and through the bracket welded to the main housing. Lock the crank in place using a washer and roll pin on each side of the bracket.

c)Thread the cable (#17) through the hole in the crank tube to even lengths and wrap around the tube to each side of the hole four turns in opposite directions.

d)With the spout turned forward, fasten the cable to the bracket welded to the bottom of the spout using a ¼” cable clamp (#70).

-5 -

Image 6
Contents Table of Contents Description Warranty Claims Warranty LaborImportant Facts Snowblower Operating Instructions Operating Instructions cont’d #500 and #600 Snowblower Assembly Instructions Hand Crank Assembly StandardMounting Blower on Tractor 500 & 600 Snowblower Assembly Instructions cont’d PTO Shield 500 & 600 Snowblower 500 & 600 Snowblower When Ordering Parts 500 & 600 SnowblowersPage Page #500 & #600 Snowblower PTO Shaft Farm King Snowblower PTO Parts List Item # Description 75 X 5 Cylinder Assembly Quantity Bundle no Description #500 Snowblower w/Hand Crank, 3-Blade Fan Y500Options Available