Husqvarna 96193006300 manual Parts Packed Separately in Carton, Assembly / PRE-OPERATION

Page 4

PARTS PACKED SEPARATELY IN CARTON

(1) AUGER CONTROL ROD

 

 

(1) MULTI-

 

 

 

WRENCH

 

 

 

(180684)

 

 

 

(3) RETAINER

(2) FLAT WASHERS

 

 

SPRINGS

 

(1) POWER CORD

(169675)

 

 

 

 

(1) DISCHARGE CHUTE

(198563)

 

 

 

 

 

ROTATOR HEAD MOUNTING

(2) CARRIAGE BOLTS 3/8-16 x 2.25

 

 

(2) SAFTEY IGNITION KEY

(1) WASHER 3/8

(1) LOCKNUT 3/8

(422663)

 

(19131316)

(73800600)

 

(2) HANDLE KNOBS

EXTRA SHEAR BOLTS AND NUTS

(2) SHEAR BOLTS 1/4-20 x 1-3/4

(2) LOCKNUTS

(192090)

1/4-20

 

(73800400)

ASSEMBLY / PRE-OPERATION

Read these instructions and this manual in its entirety

 

2.

Cut down all four corners of carton and lay panels flat.

before you attempt to assemble or operate your new

 

3.

Remove the two (2) screws securing the auger housing

snow thrower. Reading the entire manual will familiar-

 

 

 

to the pallet.

ize you with the unit, which will assist you in assembly,

 

 

 

4.

Remove all packing materials except plastic tie holding

operation and maintenance of the product.

 

 

 

speed control rod to lower handle.

Your new snow thrower has been assembled at the factory

 

 

 

5. Remove the two (2) plastic ties securing the upper

with the exception of those parts left unassembled for ship-

 

 

 

handle to the pallet.

ping purposes. All parts such as nuts, washers, bolts, etc.,

 

 

 

6. Remove snow thrower from carton and check carton

necessary to complete the assembly have been placed in

 

the parts bag. To ensure safe and proper operation of your

 

 

thoroughly for additional loose parts.

snow thrower, all parts and hardware you assemble must

 

HOW TO SET UP YOUR SNOW THROWER

be tightened securely. Use the correct tools as necessary

 

to ensure proper tightness.

 

TOOL BOX (See Fig. 8)

 

 

REMOVE SNOW THROWER FROM CARTON

 

A toolbox is provided on your snow thrower. The toolbox is

1. Remove all accessible loose parts and parts boxes

 

located on top of the belt cover. Store the extra shear bolts,

4

nuts and multi-wrench provided in parts bag in the toolbox.

from carton.

 

 

Image 4
Contents 924SB Safe Operation Practices for Walk-Behind Snow Throwers Table of Contents Assembly / PRE-OPERATION HOW to SET UP Your Snow ThrowerParts Packed Separately in Carton Remove Snow Thrower from CartonInstall Traction Drive Control ROD See Figs Install Speed Control ROD See FigsUnfold Upper Handle Install Discharge Chute / Chute Rotater Head See Fig Install Auger Control ROD See FigsCheck Tire Pressure Operation Know Your Snow ThrowerPrimer Ignition KEYMeets A.N.S.I. Safety Requirements Recoil auxiliary starter handle used for starting the engineHOW to USE Your Snow Thrower StoppingTo USE Fuel SHUT-OFF Valve See Fig To USE Choke Control See FigTo Throw Snow See Fig Using the CLEAN-OUT Tool See FigTo Move Forward and Backward See Fig To Adjust Skid Plates See Fig Before Starting the EngineScraper BAR See Fig Check Engine OIL Level See FigSnow Throwing Tips To Start EngineBefore Stopping If Recoil Starter has FrozenMaintenance General RecommendationsBefore Each USE LubricationCleaning EngineService and Adjustments To Adjust Snow Thrower HeightChute Deflector Shear Bolts See FigTo Replace Belts See Fig To Adjust Cable Tension See Fig To Remove Wheels See FigCarburetor Engine SpeedStorage OtherFuel System Engine OILTroubleshooting Warranty Statement