Husqvarna 966043501, 70 PP owner manual Assembly

Page 2

ASSEMBLY

1. Remove the spreader and components from carton and place hopper up-side down on a padded surface as shown. Insert ends of leg into handle brace as shown and align holes. Attach brace and leg to frame using (4) 1/4-20 x 2 1/4” hex bolts and locknuts.

1/4-20 X 2”

Hex Bolt

Handle

Leg

1/4-20

LOCKNUT

Drive Wheel

3/16 Dia. x

Brace

2” Cotter Pin

5/32 Dia. x

1 1/4” Cotter

Pin

Free Turning

Wheel

2. Slide wheels onto end of axle with the hub facing toward frame. Wheels are identical to ease assembly. Align the hole in the wheel hub and the hole in the axle as shown. Secure drive wheel to axle with 3/16 dia. x 2” cotter pin. Insert 1/8 dia. x 1 1/4” cotter pin in the hole near the end of axle to retain free turning wheel.

3. Turn spreader upright on wheels. Insert screen into hopper sliding it under the screen clips. Attach the upper handle assembly to handle brace with the handle lever brackets facing as shown. Secure with (4) 1/4-20 x 1 1/2” hex bolts and locknuts.

Handle

Grip

Handle

Lever

1/4 Dia.

Clevis Pin3/32” Dia.

Cotter Pin

Upper Handle

 

 

 

Screen Clip

 

Screen

 

Assembly

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/4-20 X 1 1/2”

Hex Bolt

NOTE POSITION OF

LEVER BRACKETS

1/4-20 Locknut

4. Slide handle lever between handle brackets as shown and secure with (1) 1/4 dia. clevis pin and 3/32” dia. cotter pin. Make sure lever pivots freely. Install handle grips onto upper handle. Soapy water will ease installation. (Do not use petroleum based products).

2

Image 2
Contents Model 70 PP Assembly Operation Effective Pattern Width Pattern AdjustmentHOW to Determine Spreader Settings and Spread Width Speedy Green Rate Setting ConversionApplication Rate Maintenance WidthCalibration Instructions View is Inside HopperSupply Parts Contact If Your LocalDistributor Cannot