Stewart Filmscreen Corp AVS-1005 owner manual Preparing the Installation, Preparation

Page 5

PREPARING THE INSTALLATION

Note: This manual refers to “AC” to represent electrical power. Your location may use 120 V, 220 V or other electrical power. Screen systems are manufactured using the electrical power type specified for the location. Use appropriate power sources for your location.

Preparation

Specifications regarding the individual screen dimensions, weight, mounting, and controls are provided by the factory when the unit is ordered. Before beginning the installation:

‹Check the specifications for any options.

‹Prepare the location for the AC power.

‹Ensure site has clearance for the screen when it is fully extended, and that there are no obstructions in its path.

‹Check the size and weight of the screen to be installed so that you can plan for the number of people required to move it. You need at least two people for the smaller screens; more are needed for larger, heavier screens.

You will need:

‹A level

‹Electrician tools for connecting the low-voltage control switch.

Automatic Vertical Screen: Owner’s Manual

3

Image 5
Contents AVS-Automatic Vertical Screen Page Contents Model options To the OwnerAbout your Automatic Vertical Screen AVS Preparation Preparing the InstallationAC electrical hook-up Installation and Electrical HOOK-UPInstalling the AVS Making the connection Installing the low-voltage 3-button switch on the wallPreparing the connection Operating the Screen Connecting the Screen Trigger Interface STI optionModifying the extension of the screen Adjusting the Screen ExtensionProduct Warranty Screen Care and CleaningGeneral maintenance Replacement parts and serviceProblem description Probable cause Action to take Troubleshooting