Victoreen
Operators Manual
Figure 1-1.Power Supply Functional Block Diagram
1.4Receiving Inspection and Storage
Receiving Inspection
Upon receipt of the unit:
1.Inspect the carton(s) and contents for damage. If damage is evident, file a claim with the carrier and notify Fluke Biomedical, Radiation Management Services at 440.248.9300.
2.Remove the contents from the packing material.
3.Verify that all items listed on the packing list have been received and are in good condition.
NOTE
If any of the listed Items are missing or damaged, notify Fluke Biomedical.
Storage
Storage of Victoreen instruments must comply with Level B storage requirements as outlined in ANSI N45.2.2 (1972) Section 6.1.2 (.2). The storage area shall comply with ANSI N45.2.2 (1972) Section 6.2 Storage Area, Paragraphs 6.2.1 through 6.2.5. Housekeeping shall conform to ANSI N45.2.3 (1972).
Level B components shall be stored within a fire resistant, tear resistant, weather tight enclosure, in a
Storage of Victoreen instruments must comply with the following:
1.Inspection and examination of items in storage must be in accordance with ANSI N45.2.2 (1972) Section 6.4.1.